T01 Tail Installation.
T01-04 Horizontal Stabilizer Installation.
I filled the elevator horn stop to get the required 160 degree angle for the up travel. I clamped the horizontal Stabilizer to the fuselage location. I drilled the four 1/4 in holes. I had to notch out part of the top skin to get to the aft two holes.


Click on a link to view the video:

2014-01-13-CAM-1.wmv