F09-01 Aft Lower Cabin Detail Installation.
I finished deburring all the holes and parts. I clecoed all the part together out side of the fuselage. I then check to see if it went back in place and lined up with all the holes etc. It did. So then I installed all the rivets out side of the fuselage. It was a lot easier than it would have been with every thing back in place.
I clecoed the partial assembly back in place. I then riveted the lower skin to the assembly. I then riveted the places on the inside of the assembly.
My friend Robert came over and help Laurie and me turn the fuselage right side up.


Click on a picture to enlarge it:

gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail