F11-01 Fuselage Box Assembly.
On the Aft Tunnel Web Assembly I did the counter sinking of the six holes that will get the AN470AD-4-5 rivets. Three on each end F16-04 Support Angle on the tunnel side.

I removed, deburred and dimpled the 2 F16-08 Side Clips, the F17-12 Aft Clip, and the F16-02 Forward Tunnel Zee.

I also removed and deburred the F17-09 Floor Stiffener, the F17-11 Gusset, the F17-08 Firewall Stiffener, the F17-10 Upper Clip, the P13-08 Half Hinges, and the F17-01 Lower Firewall.

With the firewall removed I was able to match drill the one center remaining hole that goes through the upper and lower firewalls into the fire wall stiffener.


Click on a picture to enlarge it:

gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail