F19-01 Turtle Deck Installation.
I located, drilled pilot holes and clecoed Formers #3 and #2 per the plans. I clamped the left and right formers to the clips at the top. I used some spacers I made to get the ends the proper distance from the center line at the top. I then drilled pilot holes into the formers from the pilot holes located in the skin. Then I drilled pilot holes in the clips at the top. Then I drilled the pilot holes at the bottom of the formers using the verticals pilot holes to locate. Since every thing was now located and pilot drilled per the plans I started up drilling to #30 size. There are a lot of holes. I will finish tomorrow.


Click on a picture to enlarge it:

gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail