F21-01 Fuselage Tail Cone Box.
Sherar Web / Bulkhead. I test fit putting the Shear Web / Bulkhead in place as an assembly. It worked just fine. So next I riveted the Shear Web Bulkhead together out side of the box. I did not rivet F22-06 Forward Angle to the assembly. Instead I riveted it to the vertical channels in the box bt it's self. I used the holes I had already drilled when the Shear Web was in the box. Next I clecoed the Shear Web / Bulkhead back in position.
Aft Area. I then up drilled to #30 all the rest of the holes in the Aft area that will be riveted now. Next I took every thing a part and deburred all the holes that were up drilled. Then I reassembled every thing with clecos. I riveted every place in the aft area that the plans required.
F24-01 Cross Tie Box Assembly. I trimmed and fit the ends to go around the splice plate. I drilled all the #40 pilot holes. First I did the front of tne box, then the top and last the F23-12 clips on the back. I then up drilled all the holes to #30. I also up drilled to 3/16th the 4 holes on top the will get the AN3-7A bolts. I test fit the bolts.


Click on a picture to enlarge it:

gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail