Builder's Log
DateAssemblyInstructionPartDescriptionLinks
11/4/2010 Shop I have started getting my shop ready for the project.  I have built three work tables based on EAA’s plans.  Two are 2ft by 5ft and one is 2ft by 4ft.  In the picture they are arrange in a 4ft by 7ft rectangle.  They can be arrange in a long 2 ft by 14ft rectangle. Photos
11/11/2010 Shop Con-Way Freight arrived around 5pm with the airframe kit. Photos
12/21/2010 Shop T08 Modified Manual Rivet puller for angles in tight places Photos
1/6/2011 Shop Tested drill sizes for AN3 Bolts Photos
2/26/2011 Shop Worked on leveling work tables. Photos
Shop-Video
06/03/2013 Shop

OK it is now too hot in the garage / workshop for me to work.
I am therefore suspending the project until some time in October when in cools down.
The temp in the garage has been starting out in the mid 80s and quickly goes into the 90s.
See you in Octorer

Photos
Shop-Video
06/17/2013 Shop

Zack visits the shop

Photos
Shop-Video
11/09/2013 Shop

Moved shop tables and power tools to the hangar

Photos
Shop-Video
11/10/2013 Shop

Moved the fuselage to the hangar with help from two good friends.
It was almost to the day three years from when my kit was delivered.

Photos
Shop-Video
12/12/2013 Shop

Ron Smith, EAA Tech Cousoler did a visitation and looked at the fuselage. He said it looked good to this point.
Since I removed the seat pan so he could look at every thing I decided to lube the hinge pins with some candle wax.

Photos
Shop-Video