Date | Assembly | Instruction | Part | Description | Links |
---|---|---|---|---|---|
11/4/2010 | Shop | I have started getting my shop ready for the project. I have built three work tables based on EAA’s plans. Two are 2ft by 5ft and one is 2ft by 4ft. In the picture they are arrange in a 4ft by 7ft rectangle. They can be arrange in a long 2 ft by 14ft rectangle. | Photos | ||
11/11/2010 | Shop | Con-Way Freight arrived around 5pm with the airframe kit. | Photos | ||
12/21/2010 | Shop | T08 | Modified Manual Rivet puller for angles in tight places | Photos | |
1/6/2011 | Shop | Tested drill sizes for AN3 Bolts | Photos | ||
2/26/2011 | Shop | Worked on leveling work tables. | Photos Shop-Video | ||
06/03/2013 | Shop | OK it is now too hot in the garage / workshop for me to work. | Photos Shop-Video | ||
06/17/2013 | Shop | Zack visits the shop | Photos Shop-Video | ||
11/09/2013 | Shop | Moved shop tables and power tools to the hangar | Photos Shop-Video | ||
11/10/2013 | Shop | Moved the fuselage to the hangar with help from two good friends. | Photos Shop-Video | ||
12/12/2013 | Shop | Ron Smith, EAA Tech Cousoler did a visitation and looked at the fuselage. He said it looked good to this point. | Photos Shop-Video |